Case study · General Contractor

Kitsilano: house lift & structural rebuild

Kitsilano, Vancouver. An existing character home stripped to its structural shell, lifted for a new foundation and lower level, then fully re-framed. Crana Construction was general contractor.

Kitsilano: work at ground level at the rear of the house during the rebuild
Work at ground level at the rear of the house, June 2019.

Project facts

Location
Kitsilano, Vancouver
Role
General Contractor
Building
Existing character home
Type
House lift & structural rebuild
Scope
New foundation, lower level, full re-frame
Also
Floor systems, envelope improvements

Overview

An existing home, lifted and rebuilt from its structure

The project started with an existing character home in Kitsilano. Crana Construction was general contractor.

The house was reduced to its original structural shell through interior and exterior demolition, then lifted so a new foundation and a new lower level could be built beneath it, designed to current building codes and engineering requirements. Crana then carried out a full structural re-frame of the house, with new floor systems, structural upgrades and exterior envelope improvements, while keeping the home’s original character.

Scope

The work, stage by stage

Every stage below is from the written project record. The verified photos cover only the later exterior stages.

1. Demolition
Interior and exterior demolition, reducing the house to its original structural shell. Not photographed.
2. House lift
The existing house was lifted to allow work beneath it. Not photographed.
3. New foundation and lower level
A new foundation and lower level, designed to current building codes and engineering requirements. Not photographed.
4. Full structural re-frame
The house was fully re-framed, with new floor systems and structural upgrades. Not photographed.
5. Exterior envelope
Exterior envelope improvements. Photographed May to August 2019.

House lift & foundation

Lifting the house to build beneath it

With the house stripped back to its structure, it was lifted so that a new foundation and a new lower level could be built underneath. Once the foundation was complete, the full structural re-frame followed.

The project record does not give the lift height, method or foundation design, so none is described here, and no verified photograph shows the lift itself.

  • The lift created access for the new foundation and lower level
  • Foundation, lower level and re-frame each depended on the stage before
  • Crana coordinated construction with the project engineer and other consultants where required

Progress record

The rear of the house, May to August 2019

The three verified site photos, in date order. They show the later stages from the back of the house; the lift and foundation work are not in the verified photo record.

Complexity

What made the project complex

Each item is from the project record.

  1. An existing home

    Work started from a character house, not a cleared site.

  2. Demolition to the shell

    The house was taken back to its original structure before rebuilding.

  3. The house lift

    The whole house was lifted to build beneath it.

  4. A new foundation and lower level

    Built under the lifted house to current codes and engineering requirements.

  5. A full re-frame

    New floor systems and structural upgrades throughout.

  6. Sequencing

    Lift, foundation, lower level and re-frame each depended on the stage before.

  7. Engineering coordination

    The record notes engineering coordination as critical to the project.

Crana's role

General contractor on Kitsilano

Crana Construction was general contractor on this project, responsible for running the construction. Crana does not provide engineering design; specialist work was carried out by qualified trades and consultants that Crana scheduled and coordinated.

Crana managed

  • Scope coordination
  • Scheduling and sequencing
  • Structural re-framing and construction
  • Site logistics
  • Trades on site
  • Finishing and closeout

Crana coordinated

  • The project engineer and other consultants, where required
  • Specialist lifting work
  • Foundation and concrete work
  • Inspections, where applicable
  • Electrical, plumbing and mechanical trades

What it demonstrates

What the project shows

  • A house lift and new foundation under an existing home
  • A new lower level added beneath a lifted house
  • A full structural re-frame of an older house
  • Sequencing a multi-stage structural rebuild
  • General contractor management with engineering coordination

Planning a substantial renovation or structural project in Vancouver?

Discuss the scope with Crana. We'll talk through the house, the structure and the sequence of work.

Early planning? Get a preliminary planning range