Home Additions

Home additions in Vancouver

Additions to existing Vancouver homes, including full second storeys, managed by Crana Construction as general contractor. We coordinate the structural work, trades and consultants that tie new construction into the house you already have.

Roof framing for the new second storey at Bruce Street
Bruce Street, East Vancouver: roof framing lifted onto the new second storey, June 2018.

Bruce Street at a glance

Project
Bruce Street
Role
General Contractor
Type
Second-storey addition
Scope
Structural re-framing of the existing house
Location
East Vancouver

Case study

Bruce Street: adding a full second storey

At Bruce Street in East Vancouver, Crana Construction was general contractor on the addition of a full second storey to an existing home. The existing roof was removed and parts of the main floor were selectively demolished. Crana then re-framed the existing house to support the new upper level and built the second floor: exterior walls, roof framing and the supporting structure. The project also included exterior upgrades, landscaping and custom concrete work.

The stages below are from the project’s own site photos, taken between April and July 2018. See the Bruce Street second-storey addition

Scope

Home additions and second storeys: what's involved

Depending on the home and design, an addition may involve one or more of the following. Bruce Street is Crana’s documented example of the first.

  1. Second-storey additions

    Adding a full upper floor to an existing house, as at Bruce Street.

  2. Rear additions

    Extending the house back into the lot, where setbacks and the design allow it.

  3. Expanded living areas

    Enlarging existing rooms by building out and opening up to new space.

  4. Additions with a major renovation

    Building new space while renovating the existing house at the same time.

  5. Structural alterations

    New beams, re-framing and supports so the existing structure can carry the new space.

  6. Reworking existing layouts

    Changing the existing rooms where they meet the addition: stairs, openings and circulation.

Connection

Connecting new construction to an existing home

The hard part of an addition is rarely the new rooms themselves. It is where new meets old. These are the issues we plan for, as practical contractor experience rather than engineering advice. Where permits, engineering or consultants are required, Crana coordinates the process as part of pre-construction.

The existing house

  • Existing structure and framing
  • Foundations, where new loads reach them
  • Existing finishes to protect or match
  • Services already in the walls and floors

The connection

  • Structural tie-ins and load paths
  • Floor elevations that have to line up
  • Roof integration and flashing
  • Weather protection while the house is open
  • Temporary protection of occupied areas

The new construction

  • New framing, floors and roof
  • Building envelope: walls, windows, roofing
  • Electrical and mechanical extended from the house
  • Finishes that work with the existing rooms

Structure first

Adding floor area changes more than the new rooms

A second storey or large addition puts new loads on the house. Those loads have to travel through the existing framing and down to the foundation, which often means changes well outside the new space.

Crana coordinates construction with the project engineer and other consultants where required. The structural design comes from the engineer. The same coordination runs through our house lifting and structural work.

Load paths
New floors and roofs add weight that has to be carried through the existing house to the ground.
Existing framing
Older framing may need to be re-framed or reinforced, as it was at Bruce Street.
Structural openings
New stairs and openings between old and new floors change how loads are carried.
Foundations
Where new loads reach the foundation, it may need to be assessed or upgraded.
Roof changes
Removing or rebuilding a roof leaves the house open, so sequencing and protection matter.
Temporary support
Parts of the structure may need temporary support while the work is done.
  • Bruce Street: new floor framing for the second storey
    Bruce Street: new floor framing for the second storey, June 2018

General contracting

What Crana manages on an addition

As general contractor, Crana is responsible for running the project. Specialist work is carried out by qualified trades and consultants that we schedule and coordinate.

Crana manages

  • Scope coordination
  • Site setup, access and logistics
  • Scheduling and construction sequencing
  • Trades on site
  • Material ordering and deliveries
  • Finishing, deficiencies and closeout

Crana coordinates

  • Structural engineers and other consultants, where required
  • Designers and architects
  • Permits and inspections, where applicable
  • Electrical, plumbing and mechanical trades
  • Specialist trades such as roofing and concrete

Renovation + addition

When the addition reaches into the existing house

Most additions change part of the existing house as well. Planning both together avoids a new space that doesn’t fit the old one.

Matching new and existing
Ceiling heights, trim, flooring and exterior finishes need to read as one house.
Reworking layouts
Stairs, hallways and openings often move to connect the new space.
Connecting systems
Electrical, plumbing, heating and ventilation are extended or upgraded to serve the addition.
Flooring and trim transitions
Where new floors meet old, levels and materials have to line up.
Kitchens and bathrooms
Sometimes part of the broader scope when the layout changes.
Structural changes
Re-framing in the existing house to support new space above or beside it.

See Major Renovations

Process

How an addition runs with Crana

  1. Discuss Your Project

    Tell us about the house, the space you want to add, any drawings, and your timeline and budget.

  2. Site Review & Scope

    We review existing conditions, structure, access and the site, and how the addition will connect to the house.

  3. Pre-Construction & Pricing

    Scope, pricing and sequencing are defined with input from the engineer and consultants. Zoning, permitting and structural feasibility are worked through here; approvals are not guaranteed. Where permits, engineering or consultants are required, Crana coordinates the process as part of pre-construction.

  4. Construction

    Opening up, structure, framing, envelope, rough-ins, inspections and finishes, sequenced and managed by Crana as general contractor.

  5. Handover & Closeout

    A final walkthrough, deficiencies completed, and handover.

Fit

Is Crana the right fit for your addition?

Crana is set up for additions where construction management matters. That usually means one or more of the following.

  • Substantial second-storey additions
  • Significant rear additions
  • A major renovation combined with an addition
  • Additions that involve structural changes to the existing house
  • Projects that need several trades and consultants working together

Most of the work Crana is set up to manage is substantial in scope, often beginning around the $150K range and increasing with structural complexity, size and finish level.

If you’re not sure whether your project fits, call us and we’ll tell you honestly.

Why Crana

On the record

The facts behind the company. More about Crana

Established
2016
Founders' experience
About 50 years combined
BC Housing
Licensed Residential Builder #46399
Memberships
HAVAN · CHBA
Home warranty
Travelers Canada 2-5-10
Addition GC
Bruce Street: second-storey addition

FAQ

Home addition questions

Can we add a second storey to an existing home?

It can be possible. Bruce Street is an example: the existing roof came off, the house was re-framed and a full second storey was built. Whether it works for your house depends on the existing structure, site, design, zoning and engineering requirements.

How do we know whether an addition is structurally feasible?

Feasibility depends on the existing home, structure, site, design, zoning and engineering requirements. The structural assessment comes from an engineer. Crana reviews existing conditions with you and coordinates with the engineer during pre-construction.

When should we involve Crana?

Early, ideally while the design is being developed, so construction input on structure, sequencing and cost can be considered before drawings are finalized.

Does Crana coordinate engineers and consultants?

Yes. As general contractor, Crana coordinates with the structural engineer, designer and any other consultants the project needs. Crana does not provide engineering design itself.

Can an addition be built while we live in the house?

It depends on the scope, safety, services and sequencing. Removing a roof or working on the structure, water, power or heating often makes staying impractical for at least part of the work. We discuss it during site review.

What affects the cost of a home addition?

Mainly the size of the addition, the structural work needed in the existing house, foundations, roof changes, how much of the existing house is renovated, and the level of finish. We work through these during pre-construction.

Does Crana coordinate permits and inspections?

Where permits, engineering or consultants are required, Crana coordinates the process as part of pre-construction.

Can an addition be combined with a whole-home renovation?

Yes. Many additions change the existing house too, and planning both together usually works better. See our Major Renovations service.

How long does a home addition take?

It depends on the size and design, structural work, permitting, site conditions and scope. We set out a schedule during pre-construction rather than quote a standard duration.