Mount Pleasant, Vancouver. A 1910 character home stripped back to its structure, lifted, relocated about four feet across its lot and rebuilt as a front-and-back duplex. Crana Construction was general contractor.

Project facts
- Project
- Mount Pleasant
- Location
- Mount Pleasant, Vancouver
- Building
- 1910 character home
- Role
- General Contractor
- Scope
- Lift, relocation, structural and foundation work, duplex conversion
- Result
- Front-and-back duplex, about 3,000 sq ft
Overview
A house lifted, moved and rebuilt
The project started with a 1910 character home in Mount Pleasant. The house was stripped back to its structural frame, then lifted and relocated about four feet across the property to suit the new design and make better use of the lot.
With the house raised, the work moved underneath it: excavation, foundation work and extensive structural upgrades. The building was then rebuilt as a front-and-back duplex of about 3,000 sq ft, two residences that keep the character of the original home. Crana Construction managed the work as general contractor.
Construction sequence
The sequence at a glance
Four stages from the project’s own site photos, April 2023 to October 2025. Each is covered in detail below.

01 Existing house April 2023 
02 Raised May 2023 
03 Below the house May 2023 
04 Finished duplex October 2025
01 Existing condition
The 1910 house, stripped back
The starting point was the original 1910 character home. Before the lift, the house was stripped back to its structural frame.

02 Lifting the house
Raised on temporary support
The house was lifted and held on temporary timber cribbing and bracing. Raising it created access to carry out major work underneath the existing building.
- The lift opened up access for excavation and foundation work below the house
- Work beneath a raised building had to be closely sequenced
- Crana coordinated construction with the project's consultants where required

03 Relocation
Moved about four feet across the lot
As part of the project, the house was relocated about four feet across the property. According to the project record, the move was made to accommodate the new design and make better use of the lot.
No photograph in the verified project record shows the move itself, so none is shown here.
04 Excavation & foundation
Working below the existing structure
With the house held above the site, excavation and foundation work could proceed beneath it. This work, and the extensive structural upgrades that followed, was managed by Crana as general contractor, coordinating with the project’s consultants where required.

05 Rebuild & duplex conversion
Rebuilt as a front-and-back duplex
The structural work was one part of a larger rebuild. The finished building is a front-and-back duplex of about 3,000 sq ft: two residences on the lot that keep the character of the original home.
The verified record does not include framing or interior-construction photos from the rebuild, so the sequence moves from the work below the house to the finished duplex.

Complexity
What made the project complex
Each of these is a matter of record for this project. Together they meant many stages, each depending on the one before.
-
An existing building
Work started from a 1910 house, not a cleared site.
-
The house lift
The whole house was raised and held on temporary support.
-
Relocation
The house was moved about four feet across the lot.
-
Excavation
Digging took place below and around a raised building.
-
Structural work
Extensive structural upgrades tied the old structure to the new work.
-
Multi-stage sequencing
Lift, excavation, foundations, structure and rebuild each depended on the stage before.
-
Duplex conversion
One house became two residences, front and back.
Crana's role
General contractor on Mount Pleasant
Crana Construction was general contractor on this project, responsible for running the construction. Crana does not provide engineering design; specialist work was carried out by qualified trades and consultants that Crana scheduled and coordinated.
Crana managed
- Project coordination
- Construction sequencing across every stage
- Trades on site
- Site logistics and access
- Construction and finishing
- Closeout
Crana coordinated
- The project engineer and other consultants, where required
- Specialist lifting and moving work
- Permits and inspections, where applicable
- Electrical, plumbing and mechanical trades
Related services
The services behind this project
Related projects
Other structural projects
Crana Construction was general contractor on both.