Case study · General Contractor

Bruce Street: second-storey addition & structural re-framing

East Vancouver. A full second storey added to an existing home: the old roof removed, the house re-framed to carry the new level, and the upper floor built. Crana Construction was general contractor.

Framing the new second storey at Bruce StreetJune 2018
Roof framing for the new second storey at Bruce Street
Framing the new second storey (left) and roof framing lifted into place (right), June 2018.

Project facts

Project
Bruce Street
Location
East Vancouver
Role
General Contractor
Type
Second-storey addition
Scope
Structural re-framing of the existing house
Also
Exterior upgrades, landscaping, concrete

Overview

A full upper level on an existing house

At Bruce Street in East Vancouver, Crana Construction was general contractor on the addition of a full second storey to an existing home.

The existing roof was demolished and parts of the main floor were selectively demolished. Crana then made significant structural modifications, re-framing the existing house to support the new upper level, and built the second floor: exterior walls, roof framing and the supporting structure. The project also included exterior upgrades, landscaping and custom concrete work.

Construction sequence

April to July 2018, on site

Six dated site photos from the project record. The photo record ends with framing; there is no verified photo of the finished house, so none is shown.

00 Starting point

An existing East Vancouver home

The project began with an existing house in East Vancouver. The project record describes the scope, not the condition of the house, so no condition is described here. There is no verified photo of the house before work began.

01 Opening up the existing structure

The roof comes off

Work began with the demolition of the existing roof and selective demolition of the main floor. Opening the house up exposed the existing framing that the new work would tie into, and left the house open while the structure was rebuilt, so the work had to be sequenced closely.

Bruce Street: existing roof framing exposed during the second-storey addition
The existing roof framing exposed as the old roof came off, April 2018.

02 Structural re-framing

Re-framing the house to carry a new level

Adding a full storey puts new loads on the existing house. Crana made significant structural modifications, re-framing the existing home so it could support the new upper level.

  • New and existing structure had to be coordinated as one
  • Re-framing was part of the addition, not separate from it
  • Crana coordinated construction with the project engineer and other consultants where required
Wall framing and layout during the Bruce Street addition
Wall framing and layout, May 2018.

03 Building the second storey

New floor, walls and roof

With the existing house re-framed, the second floor was built on top of it: the new floor structure, exterior walls, roof framing and all supporting structural components. The roof framing was lifted into place at the end of June 2018 (shown at the top of this page).

Bruce Street: new floor framing for the second storey
New floor framing for the second storey, June 2018.

04 Connecting old and new

Linking the existing floor to the new level

A second storey has to connect to the house below. New stair framing linked the existing main floor to the new upper level.

The verified photo record ends here, in July 2018. Enclosure, finishing and the completed house are not in the verified photos, so they are not shown.

New stair framing between floors at Bruce Street
New stair framing between the existing main floor and the new level, July 2018.

Complexity

What made the project complex

Each item is from the project record.

  1. An existing structure

    The new level was built on, and tied into, a house that was already there.

  2. A full upper level

    Not a bump-out: a complete second storey with its own walls, floor and roof.

  3. Structural re-framing

    The existing house was re-framed to carry the new loads.

  4. Old and new framing

    New floor, walls and roof had to connect cleanly to the existing structure.

  5. Sequencing

    Roof demolition, re-framing and the new storey followed one another, with the house open in between.

  6. More than the addition

    Exterior upgrades, landscaping and custom concrete work were part of the same project.

Crana's role

General contractor on Bruce Street

Crana Construction was general contractor on this project, responsible for running the construction. Crana does not provide structural engineering design; specialist work was carried out by qualified trades and consultants that Crana scheduled and coordinated.

Crana managed

  • Scope coordination
  • Scheduling and sequencing
  • Structural construction and framing
  • Trades on site
  • Site logistics
  • Closeout

Crana coordinated

  • The project engineer and other consultants, where required
  • Inspections, where applicable
  • Electrical, plumbing and mechanical trades
  • Exterior, landscaping and concrete work