Overview
An existing home, lifted and rebuilt from its structure
The project started with an existing character home in Kitsilano. Crana Construction was general contractor.
The house was reduced to its original structural shell through interior and exterior demolition, then lifted so a new foundation and a new lower level could be built beneath it, designed to current building codes and engineering requirements. Crana then carried out a full structural re-frame of the house, with new floor systems, structural upgrades and exterior envelope improvements, while keeping the home’s original character.
Scope
The work, stage by stage
Every stage below is from the written project record. The verified photos cover only the later exterior stages.
- 1. Demolition
- Interior and exterior demolition, reducing the house to its original structural shell. Not photographed.
- 2. House lift
- The existing house was lifted to allow work beneath it. Not photographed.
- 3. New foundation and lower level
- A new foundation and lower level, designed to current building codes and engineering requirements. Not photographed.
- 4. Full structural re-frame
- The house was fully re-framed, with new floor systems and structural upgrades. Not photographed.
- 5. Exterior envelope
- Exterior envelope improvements. Photographed May to August 2019.
House lift & foundation
Lifting the house to build beneath it
With the house stripped back to its structure, it was lifted so that a new foundation and a new lower level could be built underneath. Once the foundation was complete, the full structural re-frame followed.
The project record does not give the lift height, method or foundation design, so none is described here, and no verified photograph shows the lift itself.
- The lift created access for the new foundation and lower level
- Foundation, lower level and re-frame each depended on the stage before
- Crana coordinated construction with the project engineer and other consultants where required
Progress record
The rear of the house, May to August 2019
The three verified site photos, in date order. They show the later stages from the back of the house; the lift and foundation work are not in the verified photo record.

May 2019 Sheathing, new windows and doors, scaffolding in place 
June 2019 Work at ground level at the rear 
August 2019 Rear exterior with stairs and railings, site fencing still up
Complexity
What made the project complex
Each item is from the project record.
-
An existing home
Work started from a character house, not a cleared site.
-
Demolition to the shell
The house was taken back to its original structure before rebuilding.
-
The house lift
The whole house was lifted to build beneath it.
-
A new foundation and lower level
Built under the lifted house to current codes and engineering requirements.
-
A full re-frame
New floor systems and structural upgrades throughout.
-
Sequencing
Lift, foundation, lower level and re-frame each depended on the stage before.
-
Engineering coordination
The record notes engineering coordination as critical to the project.
Crana's role
General contractor on Kitsilano
Crana Construction was general contractor on this project, responsible for running the construction. Crana does not provide engineering design; specialist work was carried out by qualified trades and consultants that Crana scheduled and coordinated.
Crana managed
- Scope coordination
- Scheduling and sequencing
- Structural re-framing and construction
- Site logistics
- Trades on site
- Finishing and closeout
Crana coordinated
- The project engineer and other consultants, where required
- Specialist lifting work
- Foundation and concrete work
- Inspections, where applicable
- Electrical, plumbing and mechanical trades
What it demonstrates
What the project shows
- A house lift and new foundation under an existing home
- A new lower level added beneath a lifted house
- A full structural re-frame of an older house
- Sequencing a multi-stage structural rebuild
- General contractor management with engineering coordination
Related services
The services behind this project
Related projects
Other structural projects
Crana Construction was general contractor on both.